Saturday, March 16, 2013

New Chargers Added - Mar. 15th - Mar. 16th, 2013 + Truck Stop Electrification News


Plugshare is now tracking 15,978 Total Stations!
(Very Soon to hit 16,000 Stations Tracked!)

Over the last 24 hours - there have been 41 New Public Chargers added to the PlugShare network, and 3 Restricted Chargers, plus 23 New Photos, and 5 New home stations being shared. 

26 New Stations Showed up in South Carolina - because I worked the Plug In Carolina website - and today I added those to the PlugShare Website, as well!

The additions tracked are: 

  • New Public Chargers Added = 41
  • New Restricted Stations added = 3
  • New Photos Added = 23
  • New Home Stations Shared = 5

76 People Checked into Public EV Chargers today, which means that while it was double or triple the last few days, most people are still charging up at home, and just 76 needed a little extra or did not have a home charger! Or they were checking out charging stations before they needed them - to get a feel for the locations! Maybe - with warmer weather - and new EV Buyers - comes more public charging, too! 

The last person counted today - was 'Lee. Checked in at Burgeville, Potland, OR'

Special thanks to Tom, (Seaside, FL), David (Honolulu, HI), Elia (San Luis Obispo, CA), Lannie (Santa Cruz), and Mark ( W. Chicago, IL),  for sharing their Home stations access with us today!

New Public Stations today, by Name & Location (where possible):
  1. Holiday Inn Express, North Bergen, NJ
  2. Esquimalt Municipal Hall and Library, Victoria, BC
  3. Oak Bay Municipal Hall, Victoria, BC
  4. Chevron Discovery Market, Casa Grande, AZ
  5. The Franklin Institute, Philadelphia, PA
  6. Rutgers - Yellow Lot - Joyce Kimer Ave, Piscataway, NJ
  7. Lot 105 - Joyce Kimer Ave, Piscataway, NJ
  8. McDonalds's, Riverside, CA
  9. High Tech High, San Marcos, CA
  10. District of North Vancouver Hall Council Chambers, BC
  11. S. Spring St., Greenville, SC
  12. N. Church St., Greenville, SC
  13. Advanced Tech Center, Union, SC
  14. University of South Carolina, Union, SC
  15. Sheldon Town Center, Elk Grove, CA
  16. Langara College, Vancouver, BC
  17. Community Nissan of Mason City, IA
  18. Roseville Amtrak Park and Ride, Roseville, CA
  19. Kwik Trip, Charles City, IA
  20. York Electric Co-op, York, SC
  21. Rock Hill Airport, Rock Hill, SC
  22. Cherry Rd., Rock Hill, SC
  23. Johnson St., Rock Hill, SC
  24. Rock Hill City Ops Center, Rock Hill, SC
  25. Lynches River Electric Co-operative, Pageland, SC
  26. Marlboro Electric Co-operative, Bennettsville, SC
  27. North Myrtle Beach, SC
  28. HGTC Speir Building, Myrtle Beach, SC
  29. N. Poplar Dr., Surfside Beach, SC
  30. Westin Hilton Head Resort and Spa, Hilton Head, SC
  31. Aiken Electric Co-operative, Aiken, SC
  32. South Carolina Electric Co-op, Cayce, SC
  33. USC Garage, Columbia, SC
  34. USC Garage, N. Sumter St & Wheat St., Columbia, SC
  35. 519 Main Street (Horizon Garage) (#237), Columbia, SC
  36. University of South Carolina - Discovery Garage, Columbia, SC
  37. University of South Carolina - Pendleton Motor Pool, Columbia, SC
  38. Lady St., Municipal Parking Garage, Columbia, SC
  39. Sumter St. Municipal Parking Garage, Columbia, SC
  40. University of South Carolina - Senate Street Garage, Columbia, SC
  41. Central Electric Co-operative, Columbia, SC

New Restricted Stations today, by Name & Location (where possible + Link):
  1. MAPAQ - Trois Riviers, QC
  2. MTQ - CGER Longuil, QC
  3. Test, Kathmandu, Nepal

Long-haul truck drivers throughout the United States typically idle their vehicles during mandated rest periods to maintain access to air conditioning, heat, and electricity. But truck stop electrification (TSE) sites cropping up across the county allow truckers to utilize these auxiliary systems without having to run their engines.
"Truck stop electrification plays an important role in reducing unnecessary idling, fuel consumption, and...(More)
Locate truck stops with electrification sites to reduce the need for idling.

Information on Biodiesel, Electricity, Ethanol, Hydrogen, Natural Gas & Propane. 

More information on Truck Stop Electrification:



(Links not included today for all tallied public stations - may be updated and added at a later date.)

No comments:

Post a Comment